EST-24033-RCN · ALL-66-0884 · job J-10360
Fontenot, Lisa — storm/reconstruction · Lafayette, LA · estimator Alana Pierre
Revision requested Our court overdue · 27d held · over 6d our response window round 2
Current RCV
$54,200
Approved
—
Rounds
2
Submitted
41d ago
Challenged
0
Revision thread — ball-in-court
Allstate · Carrier portalGRS (estimator)
↔
Allstate (auditor)
R1 · submitted Jun 17, 1:50 AM
Roof + interior recon submitted.
+$56,100
R1 · auditor return Jun 21, 1:50 AM
Shingle unit cost high; provide code cite for drip edge.
PricingCode verify
RFG ARCH — Architectural shingles: Unit cost above PL
R2 · submitted Jun 23, 1:50 PM
Repriced shingles to PL, attached IRC R905 cite for drip edge.
-$1,900
R2 · auditor return Jul 1, 2:28 AM
Need moisture map + daily readings; O&P not warranted at this complexity.
+$0
DocsScope
DOCUMENTATION — Moisture Map Required: Auditor is requesting a moisture map to support the drying scope; daily moisture readings must be provided to validate equipment placement, drying duration, and affected material boundaries.
SCOPE — Overhead & Profit (O&P) Denied: Auditor contends the project complexity does not warrant General Contractor O&P, asserting the loss does not require coordination of multiple trades or subcontractors sufficient to justify the markup.
held 7.5d before this
Line items
0 challenged| Code | Description | Rnd | State | RCV |
|---|---|---|---|---|
| RFG ARCH | Architectural shingles (per SQ) | 1 | accepted | $18,400 |
| RFG DRIP | Drip edge - code | 1 | accepted | $1,240 |
Record
estimate = collection root{
"estimate": {
"id": "est_EST-24033-RCN",
"estimateNo": "EST-24033-RCN",
"claimNo": "ALL-66-0884",
"jobNo": "J-10360",
"carrierId": "car_allstate",
"insuredName": "Fontenot, Lisa",
"lossType": "storm",
"phase": "reconstruction",
"estimator": "Alana Pierre",
"location": "Lafayette, LA",
"rcv": 54200,
"acv": 47800,
"approvedRcv": null,
"status": "revision_requested",
"ballInCourt": "us",
"currentRound": 2,
"openedAt": "2026-06-15T01:50:23.264Z",
"submittedAt": "2026-06-17T01:50:23.264Z",
"lastActionAt": "2026-07-01T02:28:56.432Z",
"clockStartedAt": "2026-07-01T02:28:56.432Z",
"nextAction": "Answer round 2: Two issues identified: (1) Documentation deficiency — moisture map and daily psychrometric/moisture readings are required to substantiate the mitigation scope and equipment runtime. Provide logs with date/time stamps, readings per affected area, and a visual moisture map. (2) O&P dispute — auditor is denying Overhead & Profit on grounds of insufficient project complexity. Contractor should document trade coordination, subcontractor involvement, and project management burden to support reinstatement of O&P per Xactimate guidelines and applicable case law (e.g.,损 Garner v. State Farm).",
"nextActionDue": "2026-07-03T02:29:04.093Z"
},
"carrier": "Allstate",
"aging": {
"ballInCourt": "us",
"daysHeld": 27.306138935185185,
"budgetDays": 6,
"pctOfBudget": 4.551023155864198,
"state": "overdue",
"label": "27d held · over 6d our response window"
},
"counts": {
"revisions": 4,
"lineItems": 2,
"followups": 2,
"events": 5
}
}Next best action
AI● recommended move
Auditor returned round 2 citing Docs, Scope. Respond with justification and resubmit before the 4-day SLA expires.
ball: Our court · SLA 4d · audit 6d
Follow-up & follow-through
2 openEscalate to Allstate team lead — round 2 overdue
nudge_carrier · Alana Pierre · due Jun 29
Answer auditor — DOCUMENTATION, SCOPE
respond · Alana Pierre · due Jul 3
Correspondence
3 messages EST-24033-RCN — submission R0 Jun 17, 1:50 AM
▲ to claims@allstate.com · XactAnalysis
Roof + interior recon submitted.
Estimate Review — EST-24033-RCN (ALL-66-0884) Jun 21, 1:50 AM
▼ from desk-audit@allstate.com · XactAnalysis
Shingle unit cost high; provide code cite for drip edge.
EST-24033-RCN — submission R2 Jun 23, 1:50 PM
▲ to claims@allstate.com · XactAnalysis
Repriced shingles to PL, attached IRC R905 cite for drip edge.
Identity
Claim #
ALL-66-0884
Job #
J-10360
Carrier
Allstate
O&P cap
10/10
Loss / phase
storm / reconstruction
Location
Lafayette, LA
Activity
Auditor returned R2: Two issues identified: (1) Documentation deficiency — moisture map and daily psychrometric/moisture readings are required to substantiate the mitigation scope and equipment runtime. Provide logs with date/time stamps, readings per affected area, and a visual moisture map. (2) O&P dispute — auditor is denying Overhead & Profit on grounds of insufficient project complexity. Contractor should document trade coordination, subcontractor involvement, and project management burden to support reinstatement of O&P per Xactimate guidelines and applicable case law (e.g.,损 Garner v. State Farm).
auditor · Jul 1, 2:29 AM
R2 Submitted to carrier · Δ -1,900: Repriced shingles to PL, attached IRC R905 cite for drip edge.
estimator · Jun 23, 1:50 PM
R1 Auditor returned: Shingle unit cost high; provide code cite for drip edge.
auditor · Jun 21, 1:50 AM
R1 Submitted to carrier · Δ +56,100: Roof + interior recon submitted.
estimator · Jun 17, 1:50 AM
Estimate EST-24033-RCN opened for Fontenot, Lisa (storm/reconstruction).
Alana Pierre · Jun 15, 1:50 AM